Love Rain

Thursday, March 17, 2016

Building Our Love Nest (Part 9)

(Week 3 - 14/03/2016 to 17/03/2016)

3D perspective out, Painting to be done, carpentry design

3D perspective finally out after so several chasings.




Not much shown for the study as the aluminium frames and glass doors will be done by another contactor.

14.03.2016 - Painting Starts
Colours Selection


Study Area

Dining Area


Master Bedroom

Bedroom 2

Living Room - Near Main Entrance


Living Room



Master Bedroom



No comments:

Post a Comment